Pandora
Build
Area
2,000 sq ft
Location
Westwood Cross, Broadstairs
Year
2025
Delivering our first Pandora store to exacting brand standards
This was MGL Projects’ first Pandora retail unit, requiring a complete fit-out with all new finishes and ceilings throughout.
The scope included a fully glazed shopfront with fascia panel, bespoke joinery, specialist wall finishes, and tiled flooring. The programme was demanding, and the team faced a steep learning curve adapting to Pandora’s exacting standards.
Solution
Programme management was critical, with close monitoring of long-lead items such as joinery and shopfront components to ensure timely delivery. The site had to be prepared to receive and install these elements without delay.
Specialist wall finishes required dedicated time and space on-site, and bespoke joinery was installed to meet Pandora’s high standards. This structured approach ensured the project was delivered successfully within programme constraints.
Services
Delivering seamless design, bespoke joinery, and coordinated mechanical solutions to enhance functionality, quality, and project efficiency.
01
Design and Build to Brand Standards
Manage end-to-end design and construction processes that reflect the client’s brand identity, ensuring consistency in materials, finishes, and customer experience across all locations, while meeting quality, compliance, and landlord approval requirements.
02
Fast-Track Construction Delivery
Execute projects within accelerated timelines without compromising quality, safety, or compliance, ensuring seamless coordination across all stakeholders.
03
Bespoke Joinery
Managing the delivery and installation of bespoke joinery ensuring quality, precision, and timely completion in line with project specifications.
04
Structural Alterations
Manage and oversee structural modifications to existing spaces, ensuring compliance with building regulations, safety standards, and design intent.